Recently Completed Projects

Administration Building Floodgate - After

After

Administration Building Floodgate - After

After

Work in Progress

Work in Progress

Administration Building Flood Gate

Before

Administration Building Flood Gate

Start Date: July 17, 2023

Expected Completion Date: December 2023

Project Description:  Construction of a new flood barrier at the entrance to the Administration Building parking lot.


Alumni Way Gateway - After

After

Work in Progress

Work In Progress

Rendering

 Rendering

Alumni Way Gateway 

Start Date:  July 2023

Expected Completion Date: December 2023

Project Description: Construction at the west end of campus will include the installation of a Gateway Arch near the Alumni House and engraved pavers surrounding the base of the arch. The boulevard will be accented by benches, seat walls, and landscaping.


APSRC Test Cell Construction work in progress 1-2023

1/2/2023 - Work in Progress

Advanced Power Systems Research Center Test cell construction building the cinder block walls

9/26/2022 - Work in Progress

APSRC Test Cell Construction

Start Date: September 15, 2022

Expected Completion Date: November 2022

Project Description:  New test cell at Advanced Power Systems Research Center


Chem Sci H-STEM Related Renovations

Start Date: May 16, 2022

Expected Completion Date: July 2022

Project Description: Renovations in Chem Sci to accommodate faculty office being displaced by the H-STEM project.


ChemSci Labs Remodel After

After

ChemSci Labs Remodel After

After

ChemSci Labs Remodel After

After

ChemSci Labs Remodel After

After

ChemSci Labs Remodel After

After

Chemi Sci Labs Before

Before

Chem Sci Lab Before

Before

ChemSci 501 and 601 Lab Renovations

  • Start Date:   April 24, 2023
  • Expected Completion Date: August 2023
  • Project Description: Renovation and remodel of undergrad lab 501 and 601 in Chemical Sciences and Engineering Building.

DHH Restroom Remodel Nearly Complete Mirrored Entry

Complete

DHH Restroom Remodel Nearly Complete Sinks

Complete

DHH Restroom Remodel - nearly complete shower area

Complete

DHH Restroom Remodel - nearly compleet toilet area

Complete

DHH Bathroom Renovations

Start Date: April 25, 2022

Expected Completion Date: September 2022

Project Description: Renovations to the bathrooms and toilet rooms in Douglass Houghton Hall.


Dow Building East and North Roof Replacement

Start Date:  October 2023

Expected Completion Date: November10, 2023

Project Description: Remove existing roof membrane, and install new polyiso cover board and new EPDM roof membrane.


eerc

EERC Elevator Replacement

  • Start Date:   August 10, 2020
  • Expected Completion Date:  October 2021
  • Project Description: Modernization of all three elevators in the EERC Building to improve safety and reliability.

E-Sports center demolition

Demo

E-Sports center flooring being installed

 During

E-Sports center viewing area

 During

E-Sports center after

After

E-Sports Gaming Center

  • Start date:  05/11/2020
  • Expected Completion Date:  September 2020
  • Project Description: Remodel of racquetball/squash courts into the E-gaming sports center for the new E-gaming team.

Plexus Maker Space Before
Plexus Maker Space During
Plexus Maker Space second room

EERC 260-621 Plexus Maker Space

  • Start date:   July 2020
  • Expected Completion Date:  September 2020
  • Project Description: Converting (2) existing rooms into a larger collaboration space.

Fuel Tanks Work in Progress

10/28/2022 - Work in Progress

Fuel Tanks Work in Progress 8-11-2022

8/11/2022 - Work in Progress

Facilities Fuel Tanks Work in Progress

7/31/2022 - Work in Progress

Facilities Fuel Tanks Before

Before

Facilities Fuel Tanks

Start Date: July 19, 2022

Expected Completion Date: November 2022

Project Description: Removal of the existing underground fuel storage tanks and installation of new, above ground fuel storage tanks.


Fisher 324 Remodel

Before

Fisher 324 Remodel

  •  Start Date:   10/11/2021
  • Expected Completion Date: December 2021
  • Project Description: Remodel of Math Department graduate student space.

Ford Center Dormitory Roof Replacement

Ford Center Dormitory Roof Replacement

  • Start Date: 06/01/2021
  • Expected Completion Date: September 2021
  • Project Description: Remove and replace existing roofing material on dormitory building along with facia, soffit, and trim. Additional insulation to be added to the conference roof structure.

ICT Learning Center Remodel EERC 123 - Before Pic

Before

ICT Learning Center Remodel EERC 123 - After Pic

ICT Learning Center Remodel EERC 123

  • Start Date: 12/23/2019
  • Expected Completion Date: January 2020
  • Project Description: Remodel of learning center including LED lights, painting, and new furniture.

demo
footings
in progress
press box
stadium
after
 

Kearly Stadium Press Box

  • Start Date:  Restarted May 7, 2020
  • Expected Completion Date:  End of October 2020
  • Project Description:  New facility to provide better toilets, concession and press area.

KRC Cold Climate Testing Facility

Start Date: July 1, 2022

Expected Completion Date: December 2022

Project Description: New cold room testing facility located at the Keweenaw Research Center.


Lakeshore Dock - After

After

Lakeshore Dock - After

After

Lakeshore Dock - Before

Before

Lakeshore Dock - Before

Before

Lakeshore Waterfront Dock Construction

Start Date: June 12, 2023

Expected Completion Date: August 2023

Project Description:  Replace waterfront dock at the Lakeshore Center

 


Hood Installation Room Before

Before

Hood Installation Before
Hood Installation After, front view

After

Hood Installation After, side view

 

ME-EM 501 Hood Installation

  • Start Date:   11/16/2020

  • Expected Completion Date:   February 2021

  • Project Description:   Add a chemical fume hood with ventilation to MEEM Lab 501.


M and M Microfab Facilitiy Project - before

Before

Microfab Facility Air Curtain

After

Microfab Facility East Doors

After

Microfab Facilitiy West Doors

After

M&M Microfab Facility Upgrade

  • Start Date:   12/14/2020
  • Expected Completion Date:  April 2021
  • Project Description:  Renovation on the 4th floor of the M&M Building to isolate the Microfab area and install vision lights on existing doors.

Mont Ripley Slope Repair

Start Date: May 23, 2022

Expected Completion Date: September 2022

Project Description: Repair of the failed slope caused by the 2018 Father's Day Flood event.


mtu-parking-improvement

MTU Parking Lot Improvements

  • Start Date:   July 19, 2021
  • Expected Completion Date:  October 2021
  • Project Description:

    Repairs to parking lots 27, 12, 14/V2, 8, 16, and 22.


Nara Education Center nearly complete 6-29-2022

6/29/2022 - Work in progress

nara forest

11/1/2021 - Work in progress

nara-ed-center-in-progress

Work in progress

nara-ed-center-before

Before

Nara Forest Education Center

Start Date: August 30, 2021

Expected Completion Date: December 2022

Project Description: A new facility for the College of Forestry in the middle of the Nara Forest for teaching and education.


parking lot improvements

2022 Parking Lot Improvements

  • Start Date:   June 20, 2022
  • Expected Completion Date:  July 2022
  • Project Description:   Repairs to parking lots 1 and 2.

prince point

Prince's Point Access Trail Repairs

  • Start Date:   August 2021
  • Expected Completion Date:  August 2021
  • Project Description:

    Upgrades and repairs to the Prince's Point Access Trail off of Cliff Drive.

 

 
ROTC Classroom before
ROTC Classroom wall studs during
ROTC Classroom Ceiling during
ROTC Classroom empty room before
ROTC Classroom empty room before, facing room
ROTC Classroom empty after

ROTC Classroom 201 Remodel

  • Start Date:   11/04/2020
  • Expected Completion Date:   January 2021
  • Project Description:   The   project involves renovating the classroom back to its original historic appearance including, but not limited to refinishing the original hardwood floor, replacing the painted woodwork, updating communication network jacks, and providing ceiling and lighting upgrades.

rozsa-center-lobby

Rozsa Center Lobby Flooring and Painting

  • Start Date:   May 24, 2021
  • Expected Completion Date:  June 2021
  • Project Description:  Replacing the existing carpeting and painting the ceiling in the Rozsa Center lobby.
 

Rozsa Center Roof Replacement

Start Date: September 2, 2022

Expected Completion Date: October 2022

Project Description: Replacement of the west (back-of-house) roof and south east lobby roof. Maintenance repairs of the metal sloped roof as well.


snow dump

Snow Dump Flood Restoration

  • Start Date:   September 1, 2020
  • Expected Completion   Date: October 2020
  • Project Description:   Restoration of hillside near the Salt Storage Barn on Cemetery Road. The slope was damaged and has been eroding since the Father's Day Flood.

 
SDC Water Heaters
SDC Mechanical Room

Student Development Complex (SDC) Mechanical Equipment

  • Start Date:   02/03/2020
  • Expected Completion   Date: October 12, 2020
  • Project Description:   Replace existing pool filters and other pool related equipment. Also includes additional water heater for the entire building. Equipment has all been installed, and testing of new equipment is underway.

sdc-water-piping-1
sdc-water-piping-2
sdc-water-piping-3

SDC Ice Arena Roof Replacement

  • Start Date:  09/08/2020
  • Expected Completion Date:  November 2020
  • Project Description:  A full roof replacement of the John J. MacInnes Student Ice Arena. The existing ballasted rubber roof is currently being replaced with a 60 mil, single ply polyvinyl chloride (PVC) roof membrane. Phase 2 of the project is scheduled to start on October 5 and be completed by November 3.

SDC Men's Basketball Locker Room Upgrade

Start Date: May 16, 2022

Expected Completion Date: August 2022

Project Description: Remodel to include new lockers, flooring, ceiling paint, and led lighting.


SDC Water Piping

SDC Water Piping Replacement Phase 3

  • Start Date: May 1, 2023
  • Expected Completion Date: May 31, 2023
  • Project Description: Replace existing domestic water lines (cold water, hot water, and circulating hot water) with new piping and isolation valves in the pool mechanical room and in several locker rooms.

sherman-field-after

Sherman Field Turf Replacement

  • Start Date:   June 3, 2021
  • Expected Completion Date:  July 2021
  • Project Description:

    Replacement of the existing Sherman Field synthetic turf. New synthetic turf will be installed including both d-zones creating one continuous playing/practice surface  within the running track.


Hockey Varsity Locker Room Nearly Complete 9-1-2022

9/1/2022 - Nearly Complete

Hockey Varsity Locker Room Nearly Complete 9-1-2022

9/1/2022 - Nearly Complete

Hockey Varsity Locker Room Nearly Complete 9-1-2022

9/1/2022 - Nearly Complete

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Varsity Hockey Locker Room Work in progress

7/27/2022 - Work in Progress

Varsity Hockey Locker Room work in progress

7/25/2022 - Work in Progress

Varsity Hockey Locker Room work in progress

7/20/2022 - Work in Progress

Varsity Hockey Locker Room work in progress

7/20/2022 - Work in Progress

Varsity Hockey Locker room Work in Progress

7/1/2022 - Work in Progress

varsity hockey room work in progress

7/1/2022 - Work in Progress

varsity hockey room work in progress

7/1/2022 - Work in Progress

Varsity Locker Rooms work in progress

5/25/2022 - Work in Progress

varsity hockey locker rooms work in progress

5/19/2022 - Work in Progress

Varsity Hockey Facility Renovations Project

4/27/2022 - Work in Progress

Varsity Hockey Facility Renovations Project

Before

Varsity Hockey Facility Renovations Project

Finished Rendering

Varsity Hockey Facility Renovations Project

Finished Rendering

Varsity Hockey Facility Renovations Project

Start Date: April 25, 2022

Expected Completion Date: September 2022

Project Description: Renovation of the existing Husky hockey locker room, weight room, training room, corridor and puck pit areas.


  
Wads Elevator Before

 Before

Wads Elevator Flooring After

 After

Wads Elevator Ceiling After

 After

Wads East Elevator Replacement

  • Start Date:  03/09/2020
  • Expected Completion Date:  July 2020
  • Project Description:  Modernization of existing elevator in East Wads, including cab interior.

 
Wads Lounge before
Wads Lounge wall studs during
Wads Lounge ceiling during
Wads Lounge during
 

Wads Value Lounge Conversion

  • Start Date:  03/09/2020
  • Expected Completion Date:  May 2020
  • Project Description:  Convert two existing rooms, formally known as the Values Lounge area on the ground floor of Wadsworth Hall, into one collaborative classroom and multipurpose space.