Academic Office Building Social Science Reception Remodel

Academic Office Building Social Science Reception Remodel

  • Start Date: 05/13/2019
  • Expected Completion Date: July 2019
  • Project Description: Renovation of the Social Science reception area on the second floor of the Acaemic Office Building. This will make the space more inviting for collaboration and student engagement.

Campus Flood Restoration

Before

Campus Flood Restoration

After

Campus Flood Restoration

After

Campus Flood Restoration

  • Start Date: 05/13/2019
  • Expected Completion Date: July 2019
  • Project Description: The trails and paths that were damaged from the 2018 Father's Day Flood will be repaired.

Central Campus Blue Light Phones

Central Campus Blue Light Phones

  • Start Date: 09/16/2019
  • Expected Completion Date: November 2019
  • Project Description: Installation of (5) emergency blue light phones on main campus.

 
Chem-Sci Roof Replacement Before Picture

Before

Chem-Sci Roof Replacement After Picture

After

Chem-Sci Roof Replacement

  • Start Date: 04/15/2019
  • Expected Completion Date: June 2019
  • Project Description: A new roof will be installed on the Chem-Sci Building. Construction will consist of removing the existing membrane and insulation, and installing a new EPDM membrane and new insulation.

 
Chem-Sci Suite 310 Remodel

Before

Chem-Sci Suite 310 Remodel After Picture

After

Chem-Sci Suite 310 Remodel After Picture

After

Chem-Sci Suite 310 Remodel

  • Start Date: 06/03/2019
  • Expected Completion Date: July 2019
  • Project Description: Renovating the entire 310 suite to create a student learning and collaboration atmosphere with a conference room.

Daniell Heights Maintenance Project

Daniell Heights Maintenance Project

  • Please click here for additional information about this project.
  • Start Date: 05/11/2015
  • Expected Completion Date: May 2019
  • Project Description: Upgrade all of Daniell Heights Apartments. This 4-year project is being completed next month.

Dillman 204 Active Learning Classroom Remodel Before Picture

Before

Dillman 204 Active Learning Classroom Remodel After Picture

After

Dillman 204 Active Learning Classroom Remodel

  • Start date: 05/22/2019
  • Expected Completion Date: July 2019
  • Project Description: Remodeling classroom and converting it to an active learning classroom.

East McNair Steam Trap Replacement

East McNair Steam Trap Replacement

  • Start date: 05/20/2019
  • Expected Completion Date: August 2019
  • Project Description: This project consists of the removal and replacement of the existing fin tube radiator system in the dorm rooms and other specified locations in East McNair Hall. The project is to be performed during the students' summer break.

Fisher Raised Floor Removal

Fisher Raised Floor Removal

  •  Start Date: 05/13/2019
  • Expected Completion Date: July 2019
  • Project Description: Removal of the existing raised floor in the old mainframe computer room currently occupied by Physics, along with old unused electrical wiring and panels. This area will then have barrier free access, and provide a safer environment.

Hockey Team Meeting Room Before Picture

Before

Hockey Team Meeting Room During Construction

During

Hockey Team Meeting Room After

After

Hockey Team Meeting Room After Picture

After

Hockey Team Meeting Room

  • Start Date: 05/20/2019
  • Expected Completion Date: July 2019
  • Project Description: The project consists of converting an existing storage room into a tiered-seating, team meeting room location in the Hockey Educational Center at the Student Development Complex.

Kettle-Gundlach (Sustainability) House Roof Replacement

Kettle-Gundlach (Sustainability) House Roof Replacement

  • Start Date: 10/07/2019
  • Expected Completion Date: November 2019
  • Project Description: Roof replacement on the house and garage.

Lower Daniell Heights Roof Replacement

  • Start Date: 10/23/2019

  • Expected Completion Date: November 2019

  • Project Description: Re-roofing of 5 buildings in lower Daniell Heights.


2019 Sewer Improvements

Michigan Tech 2019 Sewer Improvements

  • Start Date: 05/28/2019
  • Expected Completion Date: July 2019
  • Project Description: Replacing and installing new sewer and storm sewers at the Central Heating Plant and at Dillman Hall (exterior work).

Upper Ripley Creek Washout Repair

Upper Ripley Creek Washout Repair

  • Start Date: 10/30/2019
  • Expected Completion Date: October 2019
  • Project Description: Repair of the 2018 Father's Day Flood washout on the upper portion of Ripley Creek.

Woodmar Drive Flood Repair - Before

Before

Woodmar Drive Flood Repair - After

After

Woodmar Drive Flood Repair

  • Start Date: 10/02/2019
  • Expected Completion Date: October 2019
  • Project Description: Repairs to Woodmar Drive due to damages from the 2018 Father's Day Flood.