APSRC Test Cell Construction
Start Date: September 15, 2022
Expected Completion Date: November 2022
Project Description: New test cell at Advanced Power Systems Research Center
APSRC Solar Panel Test Center
- Start Date: November 1, 2021
- Expected Completion Date: August 2021
- Project Description: New construction of a regional test center for testing photovoltaic technology.
Campus Sidewalk Improvements
- Start Date: 06/01/2021
- Expected Completion Date: June 2021
- Project Description: Repairing sections of damaged sidewalks throughout core campus.
Before

Chem Sci H-STEM Related Renovations
Start Date: May 16, 2022
Expected Completion Date: July 2022
Project Description: Renovations in Chem Sci to accommodate faculty office being displaced by the H-STEM project.
ChemSci 501 and 601 Lab Renovations
- Start Date: April 24, 2023
- Expected Completion Date: August 2023
- Project Description: Renovation oand remodel of undergrad lab 501 and 601 in Chemical Sciences and Engineering Building.
DHH Bathroom Renovations
Start Date: April 25, 2022
Expected Completion Date: September 2022
Project Description: Renovations to the bathrooms and toilet rooms in Douglass Houghton Hall.
EERC Elevator Replacement
- Start Date: August 10, 2020
- Expected Completion Date: October 2021
- Project Description: Modernization of all three elevators in the EERC Building to improve safety and reliability.
E-Sports Gaming Center
- Start date: 05/11/2020
- Expected Completion Date: September 2020
- Project Description: Remodel of racquetball/squash courts into the E-gaming sports center for the new E-gaming team.
EERC 260-621 Plexus Maker Space
- Start date: July 2020
- Expected Completion Date: September 2020
- Project Description: Converting (2) existing rooms into a larger collaboration space.
Facilities Fuel Tanks
Start Date: July 19, 2022
Expected Completion Date: November 2022
Project Description: Removal of the existing underground fuel storage tanks and installation of new, above ground fuel storage tanks.
Fisher 324 Remodel
- Start Date: 10/11/2021
- Expected Completion Date: December 2021
- Project Description: Remodel of Math Department graduate student space.
Ford Center Dormitory Roof Replacement
- Start Date: 06/01/2021
- Expected Completion Date: September 2021
- Project Description: Remove and replace existing roofing material on dormitory building along with facia, soffit, and trim. Additional insulation to be added to the conference roof structure.
ICT Learning Center Remodel EERC 123
- Start Date: 12/23/2019
- Expected Completion Date: January 2020
- Project Description: Remodel of learning center including LED lights, painting, and new furniture.
Kearly Stadium Press Box
- Start Date: Restarted May 7, 2020
- Expected Completion Date: End of October 2020
- Project Description: New facility to provide better toilets, concession and press area.
KRC Cold Climate Testing Facility
Start Date: July 1, 2022
Expected Completion Date: December 2022
Project Description: New cold room testing facility located at the Keweenaw Research Center.
ME-EM 501 Hood Installation
-
Start Date: 11/16/2020
-
Expected Completion Date: February 2021
-
Project Description: Add a chemical fume hood with ventilation to MEEM Lab 501.
M&M Microfab Facility Upgrade
- Start Date: 12/14/2020
- Expected Completion Date: April 2021
- Project Description: Renovation on the 4th floor of the M&M Building to isolate the Microfab area and install vision lights on existing doors.
Mont Ripley Slope Repair
Start Date: May 23, 2022
Expected Completion Date: September 2022
Project Description: Repair of the failed slope caused by the 2018 Father's Day Flood event.
MTU Parking Lot Improvements
- Start Date: July 19, 2021
- Expected Completion Date: October 2021
- Project Description:
Repairs to parking lots 27, 12, 14/V2, 8, 16, and 22.
Nara Forest Education Center
Start Date: August 30, 2021
Expected Completion Date: December 2022
Project Description: A new facility for the College of Forestry in the middle of the Nara Forest for teaching and education.
2022 Parking Lot Improvements
- Start Date: June 20, 2022
- Expected Completion Date: July 2022
- Project Description: Repairs to parking lots 1 and 2.
Prince's Point Access Trail Repairs
- Start Date: August 2021
- Expected Completion Date: August 2021
- Project Description:
Upgrades and repairs to the Prince's Point Access Trail off of Cliff Drive.
ROTC Classroom 201 Remodel
- Start Date: 11/04/2020
- Expected Completion Date: January 2021
- Project Description: The project involves renovating the classroom back to its original historic appearance including, but not limited to refinishing the original hardwood floor, replacing the painted woodwork, updating communication network jacks, and providing ceiling and lighting upgrades.
Rozsa Center Lobby Flooring and Painting
- Start Date: May 24, 2021
- Expected Completion Date: June 2021
- Project Description: Replacing the existing carpeting and painting the ceiling in the Rozsa Center lobby.
Rozsa Center Roof Replacement
Start Date: September 2, 2022
Expected Completion Date: October 2022
Project Description: Replacement of the west (back-of-house) roof and south east lobby roof. Maintenance repairs of the metal sloped roof as well.
Snow Dump Flood Restoration
- Start Date: September 1, 2020
- Expected Completion Date: October 2020
- Project Description: Restoration of hillside near the Salt Storage Barn on Cemetery Road. The slope was damaged and has been eroding since the Father's Day Flood.
Student Development Complex (SDC) Mechanical Equipment
- Start Date: 02/03/2020
- Expected Completion Date: October 12, 2020
- Project Description: Replace existing pool filters and other pool related equipment. Also includes additional water heater for the entire building. Equipment has all been installed, and testing of new equipment is underway.
SDC Ice Arena Roof Replacement
- Start Date: 09/08/2020
- Expected Completion Date: November 2020
- Project Description: A full roof replacement of the John J. MacInnes Student Ice Arena. The existing ballasted rubber roof is currently being replaced with a 60 mil, single ply polyvinyl chloride (PVC) roof membrane. Phase 2 of the project is scheduled to start on October 5 and be completed by November 3.
SDC Men's Basketball Locker Room Upgrade
Start Date: May 16, 2022
Expected Completion Date: August 2022
Project Description: Remodel to include new lockers, flooring, ceiling paint, and led lighting.
SDC Water Piping Replacement Phase 3
- Start Date: May 1, 2023
- Expected Completion Date: May 31, 2023
- Project Description: Replace existing domestic water lines (cold water, hot water, and circulating hot water) with new piping and isolation valves in the pool mechanical room and in several locker rooms.
Sherman Field Turf Replacement
- Start Date: June 3, 2021
- Expected Completion Date: July 2021
- Project Description:
Replacement of the existing Sherman Field synthetic turf. New synthetic turf will be installed including both d-zones creating one continuous playing/practice surface within the running track.
Varsity Hockey Facility Renovations Project
Start Date: April 25, 2022
Expected Completion Date: September 2022
Project Description: Renovation of the existing Husky hockey locker room, weight room, training room, corridor and puck pit areas.
Wads East Elevator Replacement
- Start Date: 03/09/2020
- Expected Completion Date: July 2020
- Project Description: Modernization of existing elevator in East Wads, including cab interior.
Wads Value Lounge Conversion
- Start Date: 03/09/2020
- Expected Completion Date: May 2020
- Project Description: Convert two existing rooms, formally known as the Values Lounge area on the ground floor of Wadsworth Hall, into one collaborative classroom and multipurpose space.