Recently Completed Projects

aob

Academic Office Building Social Science Reception Remodel

  • Start Date: 05/13/2019
  • Expected Completion Date: July 2019
  • Project Description: Renovation of the Social Science reception area on the second floor of the Academic Office Building. This will make the space more inviting for collaboration and student engagement.

apsr solar

APSRC Solar Panel Test Center

  • Start Date: November 1, 2021
  • Expected Completion Date: August 2021
  • Project Description: New construction of a regional test center for testing photovoltaic technology.

Admin Garden Level Remodel - Before Pic

Before

Admin Garden Level Remodel - During Pic - wall studs

During

Admin Garden Level Remodel - During Pic - drywalled area

During

Admin Garden Level Remodel - During Pic - hallway flooring

During

Admin Garden Level Remodel - During Pic - large open space

During

Admin Garden Level Remodel - During Pic area with desks

After

Admin Garden Level Remodel - After Pic - hallway

After

Admin Garden Level Remodel - After Pic - cupboards

After

Admin Garden Level Remodel - After Pic - open meeting space

After

Admin Garden Level Remodel

  • Start Date: 09/03/2019
  • Expected Completion Date: January 2020
  • Project Description: The Administration Building garden level was renovated to meet the needs of the University Marketing and Communications (UMC) department. UMC has moved back into the newly renovated space.

Campus Flood Restoration - broken path

Before

Campus Flood Restoration - fixed trail

After

Campus Flood Restoration - fixed path

After

Campus Flood Restoration

  • Start Date: 05/13/2019
  • Expected Completion Date: July 2019
  • Project Description: The trails and paths that were damaged from the 2018 Father's Day Flood will be repaired.

Campus Sidewalk Improvements - before

Before

Campus Sidewalk Improvements - after

Before

Campus Sidewalk Improvements

  • Start Date: 06/01/2021
  • Expected Completion Date: June 2021
  • Project Description: Repairing sections of damaged sidewalks throughout core campus.

Central Campus Blue Light Phones

Central Campus Blue Light Phones

  • Start Date: 09/16/2019
  • Expected Completion Date: November 2019
  • Project Description: Installation of (5) emergency blue light phones on main campus.

 Before

Before

Chem Sci H-STEM Related Renovations

Start Date: May 16, 2022

Expected Completion Date: July 2022

Project Description: Renovations in Chem Sci to accommodate faculty office being displaced by the H-STEM project.


 
Chem-Sci Roof Replacement Before Picture

Before

Chem-Sci Roof Replacement After Picture

After

Chem-Sci Roof Replacement

  • Start Date: 04/15/2019
  • Expected Completion Date: June 2019
  • Project Description: A new roof will be installed on the Chem-Sci Building. Construction will consist of removing the existing membrane and insulation, and installing a new EPDM membrane and new insulation.

 
Chem-Sci Suite 310 Remodel

Before

Chem-Sci Suite 310 Remodel After Picture - seating area

After

Chem-Sci Suite 310 Remodel After Picture - entry

After

Chem-Sci Suite 310 Remodel

  • Start Date: 06/03/2019
  • Expected Completion Date: July 2019
  • Project Description: Renovating the entire 310 suite to create a student learning and collaboration atmosphere with a conference room.

chemsci-502

After

chemsci-502-2

After

chemsci-502-3

After

ChemSci Undergrad Lab 502 Renovations

  • Start Date: July 19, 2021
  • Expected Completion Date: November 2021
  • Project Description: Renovation of Undergrad Lab 502 to match renovations previously completed in ChemSci 503 and 504.  

Daniell Heights Maintenance Project

Daniell Heights Maintenance Project

  • Please click here for additional information about this project.
  • Start Date: 05/11/2015
  • Expected Completion Date: May 2019
  • Project Description: Upgrade all of Daniell Heights Apartments. This 4-year      project  is being completed next month.

DHH Restroom Remodel Nearly Complete Mirrored Entry

Complete

DHH Restroom Remodel Nearly Complete Sinks

Complete

DHH Restroom Remodel - nearly complete shower area

Complete

DHH Restroom Remodel - nearly compleet toilet area

Complete

DHH Bathroom Renovations

Start Date: April 25, 2022

Expected Completion Date: September 2022

Project Description: Renovations to the bathrooms and toilet rooms in Douglass Houghton Hall.

 


Dillman 204 Active Learning Classroom Remodel Before Picture

Before

Dillman 204 Active Learning Classroom Remodel After Picture

After

Dillman 204 Active Learning Classroom Remodel

  • Start date: 05/22/2019
  • Expected Completion Date: July 2019
  • Project Description: Remodeling classroom and converting it to an active learning classroom.

eerc

EERC Elevator Replacement

  • Start Date: August 10, 2020
  • Expected Completion Date: October 2021
  • Project Description: Modernization of all three elevators in the EERC Building to improve safety and reliability. 

E-Sports center demolition

Demo

E-Sports center flooring being installed

 During

E-Sports center viewing area

 During

E-Sports center after

After

E-Sports Gaming Center

  • Start date: 05/11/2020
  • Expected Completion Date: September 2020
  • Project Description: Remodel of racquetball/squash courts into the E-gaming sports center for the new E-gaming team.

East McNair Steam Trap Replacement

East McNair Steam Trap Replacement

  • Start date: 05/20/2019
  • Expected Completion Date: August 2019
  • Project Description: This project consists of the removal and replacement of the existing fin tube radiator system in the dorm rooms and other specified locations in East McNair Hall. The project is to be performed during the students' summer                                break.

Plexus Maker Space Before
Plexus Maker Space During
Plexus Maker Space second room

EERC 260-621 Plexus Maker Space

  • Start date: July 2020
  • Expected Completion Date: September 2020
  • Project Description: Converting (2) existing rooms into a larger collaboration space.

Fisher 324 Remodel

Before

Fisher 324 Remodel

  •  Start Date: 10/11/2021
  • Expected Completion Date: December 2021
  • Project Description: Remodel of Math Department graduate student space.

Fisher Raised Floor Removal

Fisher Raised Floor Removal

  •  Start Date: 05/13/2019
  • Expected Completion Date: July 2019
  • Project Description: Removal of the existing raised floor in the old mainframe computer room currently occupied by Physics, along with old unused electrical wiring and panels. This area will then have barrier free access, and provide a safer  environment.

Ford Center Dormitory Roof Replacement

Ford Center Dormitory Roof Replacement

  • Start Date: 06/01/2021
  • Expected Completion Date: September 2021
  • Project Description: Remove and replace existing roofing material on dormitory building along with facia, soffit, and trim. Additional insulation to be added to the conference roof structure.

Hockey Team Meeting Room Before Picture

Before

Hockey Team Meeting Room During Construction

During

Hockey Team Meeting Room After

After

Hockey Team Meeting Room After Picture

After

Hockey Team Meeting Room

  • Start Date: 05/20/2019
  • Expected Completion Date: July 2019
  • Project Description: The project consists of converting an existing storage room into a tiered-seating, team meeting room location in the Hockey Educational Center at the Student Development Complex.

ICT Learning Center Remodel EERC 123 - Before Pic

Before

ICT Learning Center Remodel EERC 123 - After Pic

ICT Learning Center Remodel EERC 123

  • Start Date: 12/23/2019
  • Expected Completion Date: January 2020
  • Project Description: Remodel of learning center including LED lights, painting, and new furniture.

demo
footings
in progress
press box
stadium
after
 

Kearly Stadium Press Box

  • Start Date: Restarted May 7, 2020
  • Expected Completion Date: End of October 2020
  • Project Description: New facility to provide better toilets, concession and press area.

kettle-gundlach-sustainability

Kettle-Gundlach (Sustainability) House Roof Replacement

  • Start Date: 10/07/2019
  • Expected Completion Date: November 2019
  • Project Description: Roof replacement on the house and garage.

Quincy Creek Culvert

KRC Quincy Creek Culvert

  • Start Date: 10/01/2020
  • Expected Completion Date: November 2020
  • Project Description: Replace culvert and road which was washed away during the flooding in 2018.

Lower Daniell Heights Roof Replacement

  • Start Date: 10/23/2019

  • Expected Completion Date: November 2019

  • Project Description: Re-roofing of 5 buildings in lower Daniell Heights.


Lower Daniell Heights Breezeway Roof Repairs

  • Start Date: September 7, 2021
  • Expected Completion Date: December 2021
  • Project Description:

    Repair and new roofing for four of the existing flat roofs at Lower Daniell Heights.


Hood Installation Room Before

Before

Hood Installation Before
Hood Installation After, front view

After

Hood Installation After, side view

 

ME-EM 501 Hood Installation

  • Start Date: 11/16/2020

  • Expected Completion Date: February 2021

  • Project Description: Add a chemical fume hood with ventilation to MEEM Lab 501.


M and M Microfab Facilitiy Project - before

Before

Microfab Facility Air Curtain

After

Microfab Facility East Doors

After

Microfab Facilitiy West Doors

After

M&M Microfab Facility Upgrade

  • Start Date: 12/14/2020
  • Expected Completion Date: April 2021
  • Project Description: Renovation on the 4th floor of the M&M Building to isolate the Microfab area and install vision lights on existing doors.

2019 Sewer Improvements

Michigan Tech 2019 Sewer Improvements

  • Start Date: 05/28/2019
  • Expected Completion Date: July 2019
  • Project Description: Replacing and installing new sewer and storm sewers at the  Central Heating Plant and at Dillman Hall (exterior work).

Mont Ripley Slope Repair

Start Date: May 23, 2022

Expected Completion Date: September 2022

Project Description: Repair of the failed slope caused by the 2018 Father's Day Flood event.


mtu-parking-improvement

MTU Parking Lot Improvements

  • Start Date: July 19, 2021
  • Expected Completion Date: October 2021
  • Project Description:

    Repairs to parking lots 27, 12, 14/V2, 8, 16, and 22.


parking lot improvements

2022 Parking Lot Improvements

  • Start Date: June 20, 2022
  • Expected Completion Date: July 2022
  • Project Description: Repairs to parking lots 1 and 2.

prince point

Prince's Point Access Trail Repairs

  • Start Date: August 2021
  • Expected Completion Date: August 2021
  • Project Description:

    Upgrades and repairs to the Prince's Point Access Trail off of Cliff Drive.

 

 
ROTC Classroom before
ROTC Classroom wall studs during
ROTC Classroom Ceiling during
ROTC Classroom empty room before
ROTC Classroom empty room before, facing room
ROTC Classroom empty after

ROTC Classroom 201 Remodel

  • Start Date: 11/04/2020
  • Expected Completion Date: January 2021
  • Project Description: The project involves renovating the classroom back to its original historic appearance including, but not limited to refinishing the original hardwood floor, replacing the painted woodwork, updating communication network jacks, and providing ceiling and lighting upgrades.

rozsa-center-lobby

Rozsa Center Lobby Flooring and Painting

  • Start Date: May 24, 2021
  • Expected Completion Date: June 2021
  • Project Description: Replacing the existing carpeting and painting the ceiling in the Rozsa Center lobby.
 

Rozsa Center Roof Replacement

Start Date: September 2, 2022

Expected Completion Date: October 2022

Project Description: Replacement of the west (back-of-house) roof and south east lobby roof.  Maintenance repairs of the metal sloped roof as well.

 


snow dump

Snow Dump Flood Restoration

  • Start Date: September 1, 2020
  • Expected Completion Date: October 2020
  • Project Description: Restoration of hillside near the Salt Storage Barn on Cemetery Road. The slope was damaged and has been eroding since the Father's Day Flood.

 
SDC Water Heaters
SDC Mechanical Room

Student Development Complex (SDC) Mechanical Equipment

  • Start Date: 02/03/2020
  • Expected Completion Date: October 12, 2020
  • Project Description: Replace existing pool filters and other pool related equipment. Also includes additional water heater for the entire building. Equipment has all been installed, and testing of new equipment is underway.

sdc-water-piping-1
sdc-water-piping-2
sdc-water-piping-3

SDC Ice Arena Roof Replacement

  • Start Date: 09/08/2020
  • Expected Completion Date: November 2020
  • Project Description: A full roof replacement of the John J. MacInnes Student Ice Arena. The existing ballasted rubber roof is currently being replaced with a 60 mil, single ply polyvinyl chloride (PVC) roof membrane. Phase 2 of the project is scheduled to start on October 5 and be completed by November 3.

SDC Men's Basketball Locker Room Upgrade

Start Date: May 16, 2022

Expected Completion Date: August 2022

Project Description: Remodel to include new lockers, flooring, ceiling paint, and led lighting.


SDC Water Piping
SDC Water Piping in Ceiling
SDC Large water pipes

SDC Water Piping Replacement

  • Start Date: 05/03/2021
  • Expected Completion Date: 05/21/2021
  • Project Description: Replace domestic water supply piping, valves, and fittings in the Ice Arena area and locker rooms of the SDC.

sherman-field-after

Sherman Field Turf Replacement

  • Start Date: June 3, 2021
  • Expected Completion Date: July 2021
  • Project Description:

    Replacement of the existing Sherman Field synthetic turf. New synthetic turf will be installed including both d-zones creating one continuous playing/practice surface                                                                     within the running track.


Upper Ripley Creek Washout Repair

Upper Ripley Creek Washout Repair

  • Start Date: 10/30/2019
  • Expected Completion Date: October 2019
  • Project Description: Repair of the 2018 Father's Day Flood washout on the upper portion of Ripley Creek.

Hockey Varsity Locker Room Nearly Complete 9-1-2022

9/1/2022 - Nearly Complete

Hockey Varsity Locker Room Nearly Complete 9-1-2022

9/1/2022 - Nearly Complete

Hockey Varsity Locker Room Nearly Complete 9-1-2022

9/1/2022 - Nearly Complete

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Varsity Hockey Locker Room Work in progress

7/27/2022 - Work in Progress

Varsity Hockey Locker Room work in progress

7/25/2022 - Work in Progress

Varsity Hockey Locker Room work in progress

7/20/2022 - Work in Progress

Varsity Hockey Locker Room work in progress

7/20/2022 - Work in Progress

Varsity Hockey Locker room Work in Progress

7/1/2022 - Work in Progress

varsity hockey room work in progress

7/1/2022 - Work in Progress

varsity hockey room work in progress

7/1/2022 - Work in Progress

Varsity Locker Rooms work in progress

5/25/2022 - Work in Progress

varsity hockey locker rooms work in progress

5/19/2022 - Work in Progress

Varsity Hockey Facility Renovations Project

4/27/2022 - Work in Progress

Varsity Hockey Facility Renovations Project

Before

Varsity Hockey Facility Renovations Project

Finished Rendering

Varsity Hockey Facility Renovations Project

Finished Rendering

Varsity Hockey Facility Renovations Project

Start Date: April 25, 2022

Expected Completion Date: September 2022

Project Description: Renovation of the existing Husky hockey locker room, weight room, training room, corridor and puck pit areas.

 


Woodmar Drive Flood Repair - Before

Before

Woodmar Drive Flood Repair - After

After

Woodmar Drive Flood Repair

  • Start Date: 10/02/2019
  • Expected Completion Date: October 2019
  • Project Description: Repairs to Woodmar Drive due to damages from the 2018 Father's Day Flood.

  
Wads Elevator Before

 Before

Wads Elevator Flooring After

 After

Wads Elevator Ceiling After

 After

Wads East Elevator Replacement

  • Start Date: 03/09/2020
  • Expected Completion Date: July 2020
  • Project Description: Modernization of existing elevator in East Wads, including cab interior.

 
Wads Lounge before
Wads Lounge wall studs during
Wads Lounge ceiling during
Wads Lounge during
 

Wads Value Lounge Conversion

  • Start Date: 03/09/2020
  • Expected Completion Date: May 2020
  • Project Description: Convert two existing rooms, formally known as the Values Lounge area on the ground floor of Wadsworth Hall, into one collaborative classroom and multipurpose space.