Recently Completed Projects

Administration Building Floodgate - After

After

Administration Building Floodgate - After

After

Work in Progress

Work in Progress

Administration Building Flood Gate

Before

Administration Building Flood Gate

Start Date: July 17, 2023

Expected Completion Date: December 2023

Project Description:  Construction of a new flood barrier at the entrance to the Administration Building parking lot.


Alumni Way Gateway - After

After

Work in Progress

Work In Progress

Rendering

 Rendering

Alumni Way Gateway 

Start Date:  July 2023

Expected Completion Date: December 2023

Project Description: Construction at the west end of campus will include the installation of a Gateway Arch near the Alumni House and engraved pavers surrounding the base of the arch. The boulevard will be accented by benches, seat walls, and landscaping.


APSRC Test Cell Construction work in progress 1-2023

1/2/2023 - Work in Progress

Advanced Power Systems Research Center Test cell construction building the cinder block walls

9/26/2022 - Work in Progress

APSRC Test Cell Construction

Start Date: September 15, 2022

Expected Completion Date: November 2022

Project Description:  New test cell at Advanced Power Systems Research Center


Chem Sci H-STEM Related Renovations

Start Date: May 16, 2022

Expected Completion Date: July 2022

Project Description: Renovations in Chem Sci to accommodate faculty office being displaced by the H-STEM project.


ChemSci Labs Remodel After

After

ChemSci Labs Remodel After

After

ChemSci Labs Remodel After

After

ChemSci Labs Remodel After

After

ChemSci Labs Remodel After

After

Chemi Sci Labs Before

Before

Chem Sci Lab Before

Before

ChemSci 501 and 601 Lab Renovations

  • Start Date:   April 24, 2023
  • Expected Completion Date: August 2023
  • Project Description: Renovation and remodel of undergrad lab 501 and 601 in Chemical Sciences and Engineering Building.

DHH Restroom Remodel Nearly Complete Mirrored Entry

Complete

DHH Restroom Remodel Nearly Complete Sinks

Complete

DHH Restroom Remodel - nearly complete shower area

Complete

DHH Restroom Remodel - nearly compleet toilet area

Complete

DHH Bathroom Renovations

Start Date: April 25, 2022

Expected Completion Date: September 2022

Project Description: Renovations to the bathrooms and toilet rooms in Douglass Houghton Hall.


Dow Building East and North Roof Replacement

Start Date:  October 2023

Expected Completion Date: November10, 2023

Project Description: Remove existing roof membrane, and install new polyiso cover board and new EPDM roof membrane.


Fuel Tanks Work in Progress

10/28/2022 - Work in Progress

Fuel Tanks Work in Progress 8-11-2022

8/11/2022 - Work in Progress

Facilities Fuel Tanks Work in Progress

7/31/2022 - Work in Progress

Facilities Fuel Tanks Before

Before

Facilities Fuel Tanks

Start Date: July 19, 2022

Expected Completion Date: November 2022

Project Description: Removal of the existing underground fuel storage tanks and installation of new, above ground fuel storage tanks.


Ford Center Dormitory Roof Replacement

Ford Center Dormitory Roof Replacement

  • Start Date: 06/01/2021
  • Expected Completion Date: September 2021
  • Project Description: Remove and replace existing roofing material on dormitory building along with facia, soffit, and trim. Additional insulation to be added to the conference roof structure.

HSTEM Complex - After

After

HSTEM Complex - After (Interior)

After (Interior)

HSTEM Complex - After (Lab)

After  (Lab Space)

HSTEM Complex - After (Conference Room)

After (Conference Room)

HSTEM Complex - Before

Before

HSTEM Complex - Before

Before

H-STEM Engineering and Health Sciences Complex

Start Date: May 2, 2022

Expected Completion Date: February 2024

Project Description: The H-STEM Complex is a 3-story building addition on the east side of the Chemical Sciences and Engineering building. It will include newly constructed shared and flexible laboratory spaces co-located with renovated classrooms and learning spaces within the existing building. H-STEM Complex will permit teams of researchers and students from the University's various engineering and health sciences departments to work together in collaborative spaces with shared equipment. 

 


KRC Cold Climate Testing Facility

Start Date: July 1, 2022

Expected Completion Date: December 2022

Project Description: New cold room testing facility located at the Keweenaw Research Center.


Lakeshore Dock - After

After

Lakeshore Dock - After

After

Lakeshore Dock - Before

Before

Lakeshore Dock - Before

Before

Lakeshore Waterfront Dock Construction

Start Date: June 12, 2023

Expected Completion Date: August 2023

Project Description:  Replace waterfront dock at the Lakeshore Center

 


Mont Ripley Slope Repair

Start Date: May 23, 2022

Expected Completion Date: September 2022

Project Description: Repair of the failed slope caused by the 2018 Father's Day Flood event.


Nara Education Center nearly complete 6-29-2022

6/29/2022 - Work in progress

nara forest

11/1/2021 - Work in progress

nara-ed-center-in-progress

Work in progress

nara-ed-center-before

Before

Nara Forest Education Center

Start Date: August 30, 2021

Expected Completion Date: December 2022

Project Description: A new facility for the College of Forestry in the middle of the Nara Forest for teaching and education.


parking lot improvements

2022 Parking Lot Improvements

  • Start Date:   June 20, 2022
  • Expected Completion Date:  July 2022
  • Project Description:   Repairs to parking lots 1 and 2.

Rozsa Center Roof Replacement

Start Date: September 2, 2022

Expected Completion Date: October 2022

Project Description: Replacement of the west (back-of-house) roof and south east lobby roof. Maintenance repairs of the metal sloped roof as well.


SDC Men's Basketball Locker Room Upgrade

Start Date: May 16, 2022

Expected Completion Date: August 2022

Project Description: Remodel to include new lockers, flooring, ceiling paint, and led lighting.


SDC Water Piping

SDC Water Piping Replacement Phase 3

  • Start Date: May 1, 2023
  • Expected Completion Date: May 31, 2023
  • Project Description: Replace existing domestic water lines (cold water, hot water, and circulating hot water) with new piping and isolation valves in the pool mechanical room and in several locker rooms.

Hockey Varsity Locker Room Nearly Complete 9-1-2022

9/1/2022 - Nearly Complete

Hockey Varsity Locker Room Nearly Complete 9-1-2022

9/1/2022 - Nearly Complete

Hockey Varsity Locker Room Nearly Complete 9-1-2022

9/1/2022 - Nearly Complete

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Hockey Locker Room Renovations - Nearly Complete 8-11-2022

8/11/2022 - Work in Progress

Varsity Hockey Locker Room Work in progress

7/27/2022 - Work in Progress

Varsity Hockey Locker Room work in progress

7/25/2022 - Work in Progress

Varsity Hockey Locker Room work in progress

7/20/2022 - Work in Progress

Varsity Hockey Locker Room work in progress

7/20/2022 - Work in Progress

Varsity Hockey Locker room Work in Progress

7/1/2022 - Work in Progress

varsity hockey room work in progress

7/1/2022 - Work in Progress

varsity hockey room work in progress

7/1/2022 - Work in Progress

Varsity Locker Rooms work in progress

5/25/2022 - Work in Progress

varsity hockey locker rooms work in progress

5/19/2022 - Work in Progress

Varsity Hockey Facility Renovations Project

4/27/2022 - Work in Progress

Varsity Hockey Facility Renovations Project

Before

Varsity Hockey Facility Renovations Project

Finished Rendering

Varsity Hockey Facility Renovations Project

Finished Rendering

Varsity Hockey Facility Renovations Project

Start Date: April 25, 2022

Expected Completion Date: September 2022

Project Description: Renovation of the existing Husky hockey locker room, weight room, training room, corridor and puck pit areas.