March 20, 2018, Vol. 24, No. 14

The Sinking Building

ChemMet

Dennis
As I remember, the concern was prompted by the fact that each contractor had to seed the grounds when done. As successive contractors dug up freshly seeded ground, the assumption was something was wrong. But as Dad pointed out, the doors opened outward, so any subsidence would have been quickly apparent.

Myron H Berry, PE

***

I thought it was the ME-EM building that was supposed to be slowly tipping over?

Dave Bezesky
EE ‘90

That could have been true, too, Dave. Anyone else recall this?